End-to-end office and data-centre IT relocations. From decommissioning through to recommissioning, with chain-of-custody, certified cabling, and zero unplanned downtime.
IT moves are easy to underestimate and expensive to botch. We bring the project discipline, technical depth, and physical logistics that make them predictable.
Workstation, printer, peripheral, and server room teardown. Asset tagging, data wipe, and packing for transport.
Cat6, Cat6A, fibre backbone, patch panel design, and certified test results to current standards.
Rack-and-stack, UPS, cooling, and environmental monitoring. Designed for the new site, validated before cutover.
Re-imaging, asset re-tagging, user-ready setup, and white-glove desk delivery where required.
Phased cutover plans, rollback procedures, and pre/post testing for every circuit and service.
Single point of contact, detailed Gantt, weekly steering updates, and on-site supervision through go-live.
Site surveys at both origin and destination. We measure, document, and design the new layout.
Cutover schedule, risk register, communications plan, and rollback procedures. Signed off before any pack-down begins.
Phased transport, on-site supervision, and live status tracking. You always know what's where.
User acceptance, post-move hypercare, and asset reconciliation close-out.
Free 30-minute relocation scoping. We'll outline the approach, the risks, and the timeline no commitment, no sales theatre.